Supertech Towers Demolition: Noida’s AQI remains moderate, traffic restored

[ad_1]

India

oi-Deepika S

|

Published: Sunday, August 28, 2022, 16:31 [IST]

Google One India News

Noida, Aug 28: Traffic movement has been resumed at all roadways in the vicinity, nearly 30 minutes after the demolition.

The normal vehicular traffic has also returned at the Noida-Greater Noida Expressway, which was scheduled to remain closed between 2:15 and 2:45 pm in view of the demolition.

Supertech Towers Demolition: Noidas AQI remains moderate, traffic restored

Meanwhile, Noida’s air quality is reported to be in the moderate category, ranging between 115 to 140, following the demolition.

In pics: Images show how Noida twin tower turns to rubble in secondsIn pics: Images show how Noida twin tower turns to rubble in seconds

The administration is continuing with water sprinkling in the surrounding areas to reduce the particulate matter from the air.

“Broadly, no damage to nearby housing societies. Only some bit of debris has come towards the road. We will get a better idea of the situation in an hour,” said Noida CEO Ritu Maheshwari.

“Cleaning is being done, gas and electricity supply will be restored in the area while people will be allowed to enter the neighbouring societies after 6.30 pm,” she added.

How Noida Twin Tower was demolished

The Supertech twin towers in Noida were demolished on Sunday, a year after the Supreme Court’s direction to raze the illegally built structures to the ground.

The nearly 100-meter-high structures – taller than Delhi’s iconic Qutub Minar (73 meters) – were brought to the ground in seconds literally like a house of cards by the ‘waterfall implosion’ technique, in a breathtaking spectacle of modern-day engineering.

Noida Supertech demolition impact: No damage to residential towers in adjoining Emerald CourtNoida Supertech demolition impact: No damage to residential towers in adjoining Emerald Court

Minutes after the demolition, the nearby buildings appeared to be safe. They were the tallest structures to be demolished in India. Over 3,700 kg of explosives were used in the implosion that brought down the building.

  • Noida’s Supertech twin towers demolition: Timeline of key events
  • Supertech Twin Tower: Demolition to take place today, know the complete case
  • From 9 years to 9 seconds: 10 things to know about Noida Supertech’s twin tower demolition
  • SUPERTECH TWIN TOWER DEMOLITION | NOIDA-GREATER NOIDA EXPRESSWAY
  • Noida demolition: Supertech’s twin towers all set to be razed to the ground; blast scheduled at 2:30 pm
  • Massive sinkhole forms on Noida-Greater Noida Expressway| video goes viral
  • Noida twin towers demolition: Evacuation of residents from two nearby housing societies completed
  • Covid-19 Update: 9,520 new covid cases recorded in 24 hours
  • Normal Traffic movement restored after part of Greater Noida Expressway caves in | VIDEO
  • Supertech Towers: Dr. DP Kanungo, Blast team lead, explains security measures
  • Twin tower checklist for D-day: Tight security, evacuation orders, 400+ cops, 6 ambulances
  • Noida woman who abused guard drove herself to police station
  • Noida twin towers: Check Traffic diversions, roads to avoid and emergency routes on Sunday
  • No planes to fly through one nautical mile of Noida Twin Towers during demolition
  • Follow safety norms during demolition of Noida twin towers: UP CM
  • Twin Tower Demolition: Noida Expressway to be shut for vehicles on Aug 28.
  • Noida Twin Tower demolition: Evacuation plan for residents, safety arrangements, cost of implosion
  • Will Delhi’s pollution levels soar courtesy the demolition of the Noida twin towers?

Story first published: Sunday, August 28, 2022, 16:31 [IST]

[ad_2]

Source link

Leave a Reply

Your email address will not be published. Required fields are marked *

Previous post From Venice to Tokyo, Fashion’s Summer Vacation Is Over
Next post Congress Presidential election on October 17