Travel Advisory: RIDOT to Begin Removing Temporary Arches at Division Street Bridge

[ad_1]


Starting Sunday, September 11, the Rhode Island Department of Transportation (RIDOT) will begin a series of night time closures of Route 4 to remove the temporary arches at the Division Street Bridge on the East Greenwich/Warwick line. All the closures will take place from 9 p.m. to 5 a.m.

The southbound lanes of Route 4 will be the first set of closures and will occur as follows:

Sunday, September 11; Monday, September 12; Tuesday, September 13

During these closures, motorists on I-95 south who wish to take Route 4 south should follow a detour using exit 8 to Route 2/South County Trail and Division Street to access the Route 4 south on-ramp just after the East Greenwich Square shopping center. Police details will keep traffic moving through the traffic signals along the detour route.

The northbound lanes of Route 4 closures will occur as follows:

[ad_2]

Source link

Leave a Reply

Your email address will not be published. Required fields are marked *

Previous post EXCLUSIVE: K-pop group bugAboo is coming to India; will perform at Rang De Korea: K-IND Festa in New Delhi in October : Bollywood News
Next post ‘Brahmastra’ swamped with poor reviews; mega spectacle heading for disaster?